Now that council has intervened in putting back until summer time much needed works to the iron bridge down Acton lane, us pedestrians will have to put up with the constant flooding, pigeon shit, no lighting, dangerous sloping slippery walkway covered in pigeon shit, leaking overhead guttering until then. Acton residents have waited twenty years for this underpass to be improved, this spot im afraid is an absolute shit hole if this was Chiswick no doubt it would of been sorted out years ago. Therefore I challenge Labour and what's that other party called oh the Liberals whose constituencies lay either side of the bridge to pay the site a visit. There are many elderly and children that daily walk the gauntlet, this is not only a health hazard, they are putting themselves at risk to oncoming traffic as many pedestrians tend to walk too near to the road trying to miss the pigeon shit inch's deep on the tarmac.
Ricardo Pelc-Wesoly ● 4997d