Forum Topics

Public Consultation EA S.Walsh & Son App No EPR/EB3409XX/A001

Environmental Permitting (England and Wales) Regulations 2007 (as amended)Notice of Public Consultation – S. Walsh and Son Limited, Horn Lane, Acton. (EPR/EB3409XX/A001).Horn Lane Goods Yard – Resident’s Liaison Group. BackgroundThe Environment Agency consults the public on certain applications for waste operations, mining waste operations, installations, water discharges and groundwater activities. The arrangements are explained in our Public Participation Statement (https://www.gov.uk/government/publications/environmental-permitting-public-participation-statement). These notices explain;• what the application is about,• which Environment Agency office you can visit to see the application documents on the public register,• when you need to comment by.The Environment Agency will decide;• whether to grant or refuse the application,• what conditions to include in the permit (if granted).We wish to inform members of the Horn Lane Goods Yard – Resident’s Liaison Group that we have received a new bespoke application for an Environmental Permit under the Environmental Permitting (England and Wales) Regulations 2010 from S. Walsh & Son Limited for a site within the Horn Lane Goods Yard.Application DetailsApplication number: EPR/EB3409XX/A001Regulated facility type: A16: Physical Treatment Facility Regulated facility location: Horn Lane, Acton, London, W3 0JNHow to view the applicationIn person – You can view the information at the Environment Agency register at: Environment Agency, Apollo Court, 2 Bishop Square Business Park, Hatfield, AL10 9EX. You can view the register from 9.30am to 4.30pm, Monday to Friday. Continued overleafPlease call the Environment Agency’s customer contact centre on 03708 506 506 to arrange an appointment. You can ask for a copy of documents on the register. The Environment Agency may charge to cover copying costs. Electronically - There are two methods to view the application. (1) Online – Visit the Citizen Space website https://consult.environment-agency.gov.uk/psc/w3-0jn-s-walsh-and-son-ltdHow to comment on the applicationThe consultation is open from Friday 11 November 2016. If you have any comments on the application, send these by Friday 09 December. You can provide comment via three methods:          Online:      https://consult.environment-agency.gov.uk/psc/w3-0jn-s-walsh-and-son-ltd           Email:      pscpublicresponse@environment-agency.gov.uk                                                   Or write to: Environment Agency, Permitting and Support Centre, Land Team, Quadrant      2, 99 Parkway Avenue, Sheffield, S9 4WF.The Environment Agency will normally put any comments it receives on the public register, this includes your name and contact details.  Please tell us if you don’t want your response to be public. Please do not send comments to the undersigned.Other noticesSimilar adverts have been also been placed in the local newspaper with the highest circulation and on our website (https://www.gov.uk/government/collections/environmental-permitting-notices-of-applications-made).Yours sincerely,Environment OfficerEPR Waste Team - Environment Management West

Don Kelly ● 3569d2 Comments ● 3568d

Crossrail Works December2016 to January 2017

Acton Crossrail Works: Information Bulletin Saturday 10 December 2016 — Sunday 29 January 2017This bulletin provides local residents with an outline of the work Network Rail and our contractors are undertaking in the coming weeks, including over Christmas, in your area. In order to provide a safe working environment for our engineers, certain work must take place at night and at weekends. Mobile screens/barriers or enclosures will be placed around the breaking equipment and other noisy hand-held tools, where practical to do so.Crossrail works at Acton Main Line station will provide a new station building, step free access to all platforms, a new canopy on platform 4 and extended platform lengths. For more information on this work please visit: http://voNw.crossrail.co.uldroute/western-section/acton-main-line-station.The Acton dive-under is needed so that trains leaving the Acton freight yard do not delay passenger trains heading towards Acton Main Line and on to central London. For more information on this work please visit: http://www.crossrail.co.uk/news/articles/excavation-of-new-crossrail-dive-under-begins-at-acton.Please note that there will be an increase in the amount of work taking place over the Christmas and New Year periods. We will be working 24 hours a day during those periods and therefore residents may notice our presence more than usual during this time.We will be extending platform 2/3 so that the station can accommodate the longer Elizabeth line trains. Access to the station will be closed to the public at the times when we are carrying out this piece of work. Traffic may be congested at times on Horn Lane due to machinery and materials being delivered to site. All works highlighted in bold may generate some noise or disturbance which residents may notice.All workers will receive daily briefs reminding them to be considerate to our neighbours. Thank you for you continued patience.Saturday 10 — Friday 16 December 2016Saturday 23:00 to Sunday 09:00 Installation of drainage Saturday 17 — Friday 23 December 2016Saturday 22:00 to Sunday 09:00 Installation of drainage and preparatory works on Overhead Line Equipment (OLE)Monday to Friday 22:00 to 10:00 Installation of drainage and OLE preparatory worksSaturday 24 — Tuesday 27 December 2016Saturday 07:00 to Monday 08:00 Platform 3 Extension Works — set-up of site working areas; removal of part of the platform to prepare for platform extension; installation of new platform extension foundations.Saturday 22:00 to Tuesday 16:00 Relay of track, including removal and installation of rail, sleepers, and ballastProfiling, tamping and packing of ballast (including the use of a bulldozer)Work to OLE including the installation of small parts of steel and wiring as well as general inspections using a mobile elevated working platformExcavation and installation of drainage Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk Tuesday 27 — Thursday 29 December 2016Monday to Friday Compound working only Friday 30 December 2016 — Monday 2 January 2017Friday to Monday 08:00 to 18:00 Installation of drainageVarious hours between 06:00 Saturday and 18:00 Monday Platform 3 Extension Works — set-up of site working areas; removal of part of the platform to prepare for platform extension; installation of new platform extension foundations.Tuesday 3 January - Sunday 29 January 2017Saturday and Sunday Installation of foundations for overhead line structures to enable the use of06:00 — 18:00 the new Elizabeth line electric powered trains. We always try our best to install the foundations using a vibration method. However, where the ground conditions are tougher, the vibration method is not strong enough and we will need to use a stronger but noisier technique which involves the foundations being hammered into the ground to complete the essential work. These works mostly need to occur during the night or at weekends while the trains are not running on the adjacent tracks, which is essential to provide a safe working area for our engineers.Saturday 22:00 to Monday Installation of drainage and general track works06:00 Ongoing worksOngoing until 30 November 2017Various hours throughout the week • Excavation and installation of ducting, foundation bases and new drainage systems• Installation of mechanical, electrical and communication equipment• Installation of earthing and bonding cables along the station• Platform extensionThese activities may be noisy at times — created by the use of pneumatic drills breaking unexpected concrete obstructions.Various hours until 31 December 2017 Conducting site surveys, delivering and removing materials, installing mechanical, electrical and communication equipment and snagging works on platforms.These activities should not cause too much disturbance. Noisy vehicles and reversing alarms may be heard.Please note that Network Rail maintenance machines are also likely to work in this area over this period. This is not part of Crossrail works.Our contractors undertaking the above work are part of the Considerate Constructors Scheme, which includes minimising any environmental impacts and working to reduce the impact on neighbours and the public. Although we aim to undertake works at the above times and dates, at times last minute changes to track closures may result in variations.If you have any additional questions relating to the content of this bulletin please contact our 24-Hour National Helpline on 03457 11 41 41 or CRCrossrailanetworkrail.co.uk Network Rail Infrastructure Limited Registered Office: Network Rail, 2nd Floor, One Eversholt Street, London, NW1 2DN Registered in England and Wales No. 2904587 www.networkrail.co.uk

Don Kelly ● 3569d0 Comments ● 3569d

What's Happening to Acton ???

I am aware that this topic regarding the state of our streets has been mentioned on the forum numerous times, and it is obvious that the situation is getting worse!MATTRESSES AND FLY-TIPPINGRight now there are actually 4 mattresses in my area (one of which is in a neighbour's front garden) but no matter it is still an eyesore and has been there for ages.Why is this happening more and more?  Acton has become a dumping ground in recent years but yet nothing seems to be done to tackle the problem. When purchasing a bed or mattress it should be made clear that the store remove the old mattress and dispose of it otherwise NO SALE! We did this some time ago.The level of fly-tipping is getting out of control and where rubbish is dumped others seem to think they will do likewise.  We have several black bags in a street nearby for a few weeks now!Since the demise of Streetwatchers the situation has become much worse, at least we reported incidents of antisocial behaviour to the Council.GRAFFITIGraffiti is on the increase, especialy along Acton High Street where the same 'tag' appears on any spare surface, one can see it on the front of The Oaks site, The nightclub near the bridge, and at the other side of the bridge on The Vale the same 'tag' appears! I wonder what happened to the special van which used to go around cleaning up the mess left by vandals.STREET CLEANINGNow the autumn is well and truly here unfortunately this now means our streets are covered in slippery wet leaves, yet the frequency of street cleaning has decreased!  In my street there was an attempt to sweep the leaves (the evidence is 1 small half full green bag) but of course this is just a tip of the iceberg. Does anyone know how often our streets should be properly swept?  One can see the men sweeping up in Horn Lane but not the side streets unfortunately. This will lead to further problems like blocked drains, and injuries when residents slip and fall on the leaves!WHEELIE BINSAgain these are not being returned to within the boundary of each property. Residents are advised NOT to leave Wheelie Bins on the pavement but in our street and streets nearby some are permanently left on the street, and AMEY are not helping the situation as their employees seem to just leave them on the pavement!Rant over!

Jean F Fernandez ● 3577d5 Comments ● 3573d