Forum Topics

Roadworks and bus diversions

I reproduce below the front page article re roadworks. These works will, I imagine, cause traffic problems and will delay the replacement bus service for the Turnham Green - Ealing Broadway nine day closure starting this weekend.Although the details are to be confirmed I think the following bus diversions will take place:607, 207 and 440 diverted Twford Avenue - Noel Road - Horn Lane.427 - will endeavour to run to/from Acton Market Place but may have to be curtailed to start and finish at Ealing Broadway.E3 diverted via Bollo Lane, Bollo Bridge Road and Acton Lane.266 will be subject to delays in the Horn Lane area. If I r5eceive any more concrete information I will update. A section of Acton High Street will be closed for 5 daysThere will be road closures and diversions next week as Thames Water begin emergency sewer repairs in Acton.The High Street will be closed between Acton Police Station (Steyne Rd) and Gunnersbury Lane with diversions via other local routes clearly signposted. Two-way temporary traffic lights will also be set up on junction of Gunnersbury Lane and the High Street.The road will be closed at 6am on Sunday and work will be carried out 24 hours a day until the sewer pipe has been repaired and the road resurfaced. The job is expected to take five days.Micheal Wells from Thames Water has apologised for the anticipated disruption : '' We know it’s frustrating when journeys are disrupted and we’re sorry for any inconvenience the work may cause, but it is a ‘must-do’ job. When a sewer pipe is broken the sewage doesn’t flow through it and instead backs up into the network of pipes, often into properties through toilets and sinks. It’s a truly miserable experience so we have to do all we can to protect our customers from it. We’ll be working day and night to get the job done and the road reopened as quickly as possible.'

Patrick Green ● 4027d4 Comments ● 4023d

Planned Tube improvement works affecting services in Acton

From TfL Press OfficeMajor rail junction replacement will improve reliability of District and Piccadilly lines                                        • Hanger Lane rail junction to be modernised in October• Work will ensure the junction is more reliable and trains will run faster• Forms part of complete modernisation of four Tube linesA major rail junction will be replaced next month to improve reliability on both the District and Piccadilly lines.London Underground (LU) engineers and contractors will completely renew and realign the Hanger Lane junction to make it faster, smoother and more reliable for the thousands of customers who travel through the area each day.The junction rebuild involves breaking out and renewing track and signalling over nine days from Saturday 24 October to Sunday 1 November. During the work the District line will need to close between Ealing Broadway and Turnham Green, with the Piccadilly line closing from Acton Town to Uxbridge on the two weekends during the period. Other Tube services will continue to serve the area, as will rail replacement and local bus services. TfL will publicise the closure and alternative routes to customers to minimise disruption and keep them up to date.Innovative use of modern installation techniques means the work will be done in two halves, rather than all at once, allowing the Piccadilly line to remain open on weekdays. In the past the new points, which are moving sections of track that allow trains to change from one line to another, would have been installed all at once, closing both lines throughout the work.LU will take full advantage of the closure of the District line section to carry out other essential work at Ealing Broadway, preparing for the full modernisation of the line. Engineers will also replace an additional 330 metres of track, making the entire area more reliable, with a smoother ride.During the closure there will be some changes to transport services:• The District line will not run between Ealing Broadway and Turnham Green. But the Central line will continue to serve Ealing Broadway every day as normal• The Piccadilly line will run as normal on weekdays, providing alternative Tube routes from Ealing Common and Acton Town • The Piccadilly line will close between Acton Town and Uxbridge on the weekends of 24/25 October and 31 October/1 November• Trains will not run from Chiswick Park Underground station throughout, but it will be open to serve customers with tickets and information• Rail replacement buses will serve Ealing Broadway, Ealing Common, Acton Town and Chiswick Park throughout the work, supplementing existing local bus routes• LU will run 50 per cent more District line services to Richmond to serve the semi-finals and final of the Rugby World Cup on 24, 25 and 31 OctoberThe work forms part of the next phase of the Underground's modernisation, bringing faster, more frequent and more reliable journeys to millions of Circle, District, Hammersmith & City and Metropolitan line passengers. Customers are already seeing a new fleet of air-conditioned trains being introduced, which will all be in service by the end of 2016. Work will soon begin on new signalling and control systems for the four lines, with the improvements together boosting capacity by an average of a third.David Waboso, LU’s Director of Capital Programmes, said: “Our engineers and contractors will be working around the clock to replace this complex junction. I am sorry for the disruption to customers during the closure, which we will keep as short as possible. When the junction re-opens, it will be immediately more reliable and trains will be able to travel faster through it. District line customers will see more and more new trains over the next year, followed by a complete modernisation of the line’s signalling that will radically improve journeys.”ENDSNotes to editors• Hanger Lane rail junction is where the Ealing Broadway branch of the District line divides from the Uxbridge branch of the Piccadilly line • The work does not affect Hanger Lane Underground station • During the closure, three fewer off peak trains will run each hour on the District line between Turnham Green and Barking • Following the work, trains will be able to run faster and more smoothly through the junction. Points failures will be much less frequent, meaning fewer delays to customers and more reliable journeys through Ealing and Chiswick • The current Hanger Lane railway junction was built in 1984 and the poor condition of the ground on which it rests requires frequent maintenance and leads to repeated points failures, causing delays to District and Piccadilly line customers.

Patrick Green ● 4061d4 Comments ● 4026d