Forum Topics

Response Re: Overnight Noise (Horn Lane) Crossrail

I have been passed on your complaint about works at Acton from Ealing Council. Firstly please accept my apologies for the disturbance this work has caused you. I have tried contacting you; I hope the below gives your some reassurance but if you would like to discuss further my number is below. Since late last year Network Rail has been undertaking piling work for the new overhead line equipment along the line. For safety reasons, it is necessary to do this work at night when we have possession of the tracks. This work has taken significantly longer than we had hoped due to a number of engineering problems.To ensure we finish this work on time, we have been working some weeknights, as well as Sunday early mornings. We hope to use as few of these week nights as possible. I can confirm no midweek nights will be used for piling for the next few weeks. After this we may need to undertake work on a few more mid-week nights. Our project team and contractors are currently looking at the schedule to see how we can minimise disruption for residents and complete this section of work as soon as possible.Regarding the noise from the works due to the ground conditions at Acton, we have had to use the hammer pile method on many of the piles as the quieter vibration method cannot work in particularly hard ground. We do monitor noise and vibration from these works to ensure they are within levels agreed with Ealing Council and do not cause adverse impact on local properties and our own assets.  You also mentioned notifications in your email; it is our policy to notify residents within 100m of works in order to make them aware of works and any disruption.  For Acton we have extended this notification area due to the number of residential properties and type of work we have been doing but it seems your road was still out of this area. Following your complaint I have extended the area further to ensure you are notified and added your email to they system, so you will also get electronic notifications. I have also attached an updated bulletin of works for the coming weeks.I hope this information has been useful, please do contact me if you have any further questions.Kind regardsOlivia WhiteCommunications Manager - Crossrail WestNetwork RailKing's PlaceYork WayLondon N1 9AG 07720 512753

Maria Fitzsimmons ● 4833d0 Comments ● 4833d

Acton Yard Crossrail Works Fr 14th Jun to Fr 19th Jul

Dear all For your information:Acton Yard Crossrail Works: Information Bulletin(Friday 14 June – Friday 19 July 2013)We have now moved into the main phase of the works at Acton diveunder with piling works for the diveunder progressing well. As notified in May, we are now working additional weeknights to do overhead line piling works, following considerable engineering delays on this section of the project. We have permission from Ealing Council to work Monday to Thursday nights until the end of November 2013, although we aim to do piling only some of these nights. The way we install piles depends on the ground conditions. We aim to use the quieter vibration method as far as possible, which vibrates the piles into place. However, this machine cannot work in particularly hard ground, and in that case we would have to use the noisier hammer pile method.Below covers the works scheduled to take place over the next month. All works highlighted in red are particularly likely to be noisy. Weekdays Date and time Monday 17 June to Thursday 20 June (01.00 – 04.00)Type of work Piling for overhead line equipmentLocation From Horn Lane Bridge to the west of Noel Road Bridge, opposite Oakley AvenueDisruption This involves driving tubular steel foundations into the ground and is likely to generate some hammering noise and possible vibration.Daytime (08.00 – 18.00) Installation of guidewalls for the eastern section of the diveunder Works at Oakley House. Site set-up is almost complete and the main works are due to start at the beginning of July.Nightime Overhead line cable works will take place during week nights along the track residents may notice machinery on the track WeekendsDate and time Sundays (00.01 – 09.00)Type of work Piling for overhead line equipment Location From Horn Lane Bridge to the west of Noel Road Bridge, opposite Oakley AvenueDisruption This involves driving tubular steel foundations into the ground and is likely to generate some hammering noise and possible vibration.Other works On the weekend possessions (Sunday 00.01 – Monday 04.00) general yard work will also take place, including cable works on the overhead lines; ballasts, which involves a roller and removing concrete foundations of two piles to the west of Noel Road Bridge.Although we aim to undertake works at the above times and dates, at times last minute changes to track possessions may mean variations.  If you have any additional questions relating to the content of this bulletin please contact our 24-Hour National Helpline on 08457 11 41 41 or crwest@networkrail.co.ukFor more information on Crossrail visit www.crossrail.co.uk

Maria Fitzsimmons ● 4834d0 Comments ● 4834d